首页
期刊导航
期刊检索
论文检索
新闻中心
期刊
期刊
论文
首页
>
《电气:英文版》
>
1997年2期
>
Construction of Ling’ao Nuclear Power Plant proceeds as scheduled
Construction of Ling’ao Nuclear Power Plant proceeds as scheduled
打印
分享
在线阅读
下载PDF
导出详情
摘要
未填写
DOI
n4907mmx4y/715835
作者
机构地区
不详
出处
《电气:英文版》
1997年2期
关键词
分类
[电气工程][电机]
出版日期
1997年02月12日(中国期刊网平台首次上网日期,不代表论文的发表时间)
相关文献
1
.
Ling’ao Nuclear Power Plant is progressing as scheduled
.电机,1996-03.
2
.
Ling’ao Nuclear Power Plant is well under way
.电机,1998-04.
3
.
Tianwan Nuclear Power Plant starts operation
.电机,2005-05.
4
.
Hunan Xiangtan B Power Plant scheduled to begin operation on December 26
.电机,1998-01.
5
Xin-Qian Bian (1) Ben-kun Yang (1) Ji Shi (1).
New Model and Simulation of Condenser for Ship Nuclear Power Plant
.船舶与海洋工程,2002-01.
6
.
Cooperative frame agreement of Bailong Nuclear Power Plant signed
.电机,2006-03.
7
.
The construction of Zhangzhou Houshi Power Plant ofFujian Province is in full swing
.电机,1998-02.
8
.
The first domesticated large-sized nuclear power plant was built up
.电机,2001-04.
9
刘德辅;韩凤亭;庞亮;李华军;谢波涛;王风清.
Probabilistic Approach of Coastal Defense Against Typhoon Attacks for Nuclear Power Plant
.海洋科学,2010-02.
10
Shufeng WANG;M.I.M. WAHAB;Liping FANG.
MANAGING CONSTRUCTION RISKS OF AP1000 NUCLEAR POWER PLANTS IN CHINA
.系统科学,2011-01.
来源期刊
电气:英文版
1997年2期
相关推荐
Sanmen nuclear power project's huge credit granted by China Construction Bank
Fault Diagnosing System of Steam Generator for Nuclear Power Plant Based on Fuzzy Neural Networks
Aseismic safety analysis of a prestressed concrete containment vessel for CPR1000 nuclear power plant
Haiyang nuclear plant anproved
Shanghai Waigaoqiao Power Plant -A New Domestic Engineering, Equipment Supplying, Constructing Large Power Plant
同分类资源
更多
[电机]
Research and Implementation of Multi-Point Automatic Synchronization Based on Active Frequency Tracking Control
[电机]
顾客角色转变下的营销战略调整
[电机]
塑料电子封装件中湿扩散有限元分析
[电机]
基于多新息扩展卡尔曼滤波的直接转矩控制研究
[电机]
基于2.4G无线传输的校园环境检测系统
相关关键词
返回顶部